U Z K I M Y O S A N O A T L O Y I H A

Loading...

ABOUT US

Timely provision of technical documentation for the construction of facilities and the implementation of architectural supervision of the construction of facilities

More..

Contacts

  • Republic of Uzbekistan, Tashkent Region, Chirchik City, Tashkent St.4.
  • +99870-715-27-67
  • office@himproekt.uz

Department for the design of the construction part

Sections

Department for the design of the construction part

TASKS AND FUNCTIONS

 

The main task of the construction is the development of the construction part, heating, ventilation and air conditioning systems of the projects being carried out, within the time limits set by the plan, to ensure the construction of the projected facilities with technical documentation;
The objective function of the department is to ensure a high technical level and high economic efficiency of the designed facilities based on the maximum use of the latest achievements of science and technology in the design.
Types of work performed by the department: execution of calculations and drawings of building structures and assemblies; calculation of physical volumes of work and preparation of lists of materials for the architectural and construction part of projects; preparation of materials for feasibility studies (feasibility studies) for the placement of new plants or productions;
execution of demonstration materials on projects developed by the department;

participation in the design of security systems of the enterprise together with the department for the design of power supply, power electrical equipment and communications of the Company and a specialized design institute that performs the project of automatic security alarm;

development of technical documentation for heating, ventilation and air conditioning systems of the designed facilities;

coordination in accordance with the established procedure of the decisions adopted in the draft with related departments;

execution of expert examination of projects of contracting design organizations on the instructions of the Company's management;

participation, if necessary, in the protection of projects in approving authorities;

implementation of the author's supervision of the objects under construction according to the projects of the department;

participation in the work of the scientific and technical council for the review of developed projects;

receiving and sending correspondence in accordance with the instructions for office work.